UNDERSTANDING THE CONTRACTOR LOAD ASSIGNMENT INFORMATION PAGE -
Equipment Type:
Refer
Check this option if the load requires a refrigerated trailer.
Maintain
Enter the temperature that the trailer needs to be maintained at.
Van
Check this box for a Van type trailer.
Flat Bed
Check this box for a Flat Bed trailer
Other
Check this box for other equipment types or to specify a particular type of trailer.
Other Description
Enter a description for the other equipment.
Rate Section:
Rate Quan
Enter the quantity for the rate type. Will be multiplied times the Rate Amount
Rate Type
Flat, Miles, Weight (enter type tons, pounds, etc)
Rate Amount
Will be multiplied times the Rate Quan to get the rate. (Load Total)
Stop Pay
If there will be stop pay enter the amount here (total amount for load not per stop)
Driver Load
Check this box if the driver is expected to load the trailer
Driver Unload
Check this box if the driver is expected to unload the trailer
Load/Unload
Enter the total amount to be paid contractor for loading/unloading
Other Pay
Enter any Other Pay that will be paid to the contractor
Pallet Exchange
Check this box if the contractor much have pallets for a pallet exchange
Pallet Charge
Enter the amount you will pay the contractor for the pallet exchange
Special Instructions
Enter any special instructions for the contractor
Other Charge
Enter any Other amounts that will be paid to the contractor
Days to Pay
Enter the number of days before payment is due. Bill will be due in that number of days
For Company
Name of the person who will sign contract for the company
Contact
Name of the person who will sign the contract for the contractor
LOAD TOTAL
Adds up the various amounts and totals them at the bottom.
LOAD INFORMATION: This is brought in from the Billing page so you have what the load pays you available
Description
Description of the load or product being shipped
Pieces
Number of pieces
Weight
Weight of load
Miles
Miles for load
Bill Amount
Bill Amount
Surcharge
Surcharge Amount
Advance:
Advance Amt.
The amount of advance that is being paid on the load.
Note:
It is assumed the Advance will be given to the contractor or his representative (driver) so the amount of the advance is deducted from the Bill when its created.
In order for the program to see the Advance it must be ended in I&E as ADVANCED and show the correct Pro Number for the advance entry.
Buttons:
Assign/Print
Assign the load, print the contract & schedule, create the Bill in I&E
Save
Save changes to the contract. CANNOT BE EDITED AFTER ASSIGN & PRINT
Delete
Delete the contract. CANNOT BE DELETED AFTER ASSIGN & PRINT
Find
See FIND topic in this section for details on finding a previous contract.